Avdiivka Coke Plant

Авдіївський коксохімічний завод

⚠ Re-damaged 3 time(s) — material investor-information field
Industrial and Agricultural industrial.coke In pipeline Occupied territory (pipeline only)

Location

OblastDonetsk
SettlementAvdiivka
AddressAvdiivka Coke Plant, Avdiivka, Donetsk Oblast
Coordinates48.1394°N, 37.7487°E

View on OpenStreetMap ↗

Damage Record

Incident date2022-02-24
Incident typeartillery shelling
Destruction levelDestroyed (95–110%)
Re-damage count3 ⚠ Material investor-information field
Verified by

Evidence sources

  • KSE Russia Will Pay — Avdiivka Coke Plant KSE

Wartime Status

Lifecycle stageIn pipeline
RebuildabilityOccupied territory (pipeline only)
Sovereign risk bandsevere
De-risking instrumentsNone identified

Physical Specifications

production capacity mt per year 4.6 million tonnes/year extracted from source
annual capacity tonnes 4,600,000 tonnes/year extracted from source

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 886.6M – USD 3,017.4M
Central: USD 1,952M

Code-compliant

Rebuild to current EU/UA building codes

USD 1,020.2M – USD 3,772.2M
Central: USD 2,396.2M

Build-back-better

Rebuild with technology overlays

USD 1,152.9M – USD 4,828.2M
Central: USD 2,990.1M

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

5%5%15%20%10%10%35%
Show full capital stack
Tranche%
Grant (Pillar I)5%
ERA / Frozen Assets—
First-loss / Guarantee5%
Concessional IFI Debt15%
Senior IFI (near-mkt)20%
ECA-Covered Debt—
DFI Equity / Quasi-eq.10%
Public / Municipal Eq.—
Diaspora / Patriotic Bd—
Commercial Bank Debt10%
Institutional Debt—
Private Equity / Infra35%

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, ECA

INDUSTRIAL_BASELINE

Code-compliant

10%5%15%20%10%10%30%
Show full capital stack
Tranche%
Grant (Pillar I)10%
ERA / Frozen Assets—
First-loss / Guarantee5%
Concessional IFI Debt15%
Senior IFI (near-mkt)20%
ECA-Covered Debt—
DFI Equity / Quasi-eq.10%
Public / Municipal Eq.—
Diaspora / Patriotic Bd—
Commercial Bank Debt10%
Institutional Debt—
Private Equity / Infra30%

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, ECA

INDUSTRIAL_CODE_COMPLIANT

Build-back-better

15%5%15%20%10%10%25%

Green steel / decarbonisation pathway unlocks EU industrial recovery grants; private equity anchor expected from strategic investor

Show full capital stack
Tranche%
Grant (Pillar I)15%
ERA / Frozen Assets—
First-loss / Guarantee5%
Concessional IFI Debt15%
Senior IFI (near-mkt)20%
ECA-Covered Debt—
DFI Equity / Quasi-eq.10%
Public / Municipal Eq.—
Diaspora / Patriotic Bd—
Commercial Bank Debt10%
Institutional Debt—
Private Equity / Infra25%

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, ECA

INDUSTRIAL_BBB

Record Metadata

Asset IDAVDIIVKA_COKE_PLANT_2022_02_24
Last reviewed2026-10-22
Schema version1.0.0
Tagsindustrial, coke, donetsk, avdiivka, occupied