Azovstal Iron and Steel Works, Mariupol

Металургійний комбінат «Азовсталь», Маріуполь

Industrial and Agricultural industrial.steelworks In pipeline Occupied territory (pipeline only)

Location

OblastDonetsk
SettlementMariupol
AddressAzovstal Iron and Steel Works, southern Mariupol, Donetsk Oblast
Coordinates47.0665°N, 37.6003°E

View on OpenStreetMap ↗

Damage Record

Incident date2022-03-01
Incident typeartillery shelling
Destruction levelDestroyed (95–110%)
Re-damage count0
Verified by

Evidence sources

  • KSE Russia Will Pay — Azovstal industrial damage KSE

Wartime Status

Lifecycle stageIn pipeline
RebuildabilityOccupied territory (pipeline only)
Sovereign risk bandsevere
De-risking instrumentsNone identified

Physical Specifications

production capacity mt per year 6.5 million tonnes/year extracted from source
floor area m2 — m² pending data
annual capacity tonnes 6,500,000 tonnes/year extracted from source

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 3,342.1M – USD 10,659.8M
Central: USD 7,001.4M

Code-compliant

Rebuild to current EU/UA building codes

USD 3,842.8M – USD 13,325.2M
Central: USD 8,584.5M

Build-back-better

Rebuild with technology overlays

USD 4,344.5M – USD 17,056M
Central: USD 10,700.2M

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

5%5%15%20%10%10%35%
Show full capital stack
Tranche%
Grant (Pillar I)5%
ERA / Frozen Assets—
First-loss / Guarantee5%
Concessional IFI Debt15%
Senior IFI (near-mkt)20%
ECA-Covered Debt—
DFI Equity / Quasi-eq.10%
Public / Municipal Eq.—
Diaspora / Patriotic Bd—
Commercial Bank Debt10%
Institutional Debt—
Private Equity / Infra35%

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, ECA

INDUSTRIAL_BASELINE

Code-compliant

10%5%15%20%10%10%30%
Show full capital stack
Tranche%
Grant (Pillar I)10%
ERA / Frozen Assets—
First-loss / Guarantee5%
Concessional IFI Debt15%
Senior IFI (near-mkt)20%
ECA-Covered Debt—
DFI Equity / Quasi-eq.10%
Public / Municipal Eq.—
Diaspora / Patriotic Bd—
Commercial Bank Debt10%
Institutional Debt—
Private Equity / Infra30%

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, ECA

INDUSTRIAL_CODE_COMPLIANT

Build-back-better

15%5%15%20%10%10%25%

Green steel / decarbonisation pathway unlocks EU industrial recovery grants; private equity anchor expected from strategic investor

Show full capital stack
Tranche%
Grant (Pillar I)15%
ERA / Frozen Assets—
First-loss / Guarantee5%
Concessional IFI Debt15%
Senior IFI (near-mkt)20%
ECA-Covered Debt—
DFI Equity / Quasi-eq.10%
Public / Municipal Eq.—
Diaspora / Patriotic Bd—
Commercial Bank Debt10%
Institutional Debt—
Private Equity / Infra25%

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, ECA

INDUSTRIAL_BBB

Record Metadata

Asset IDAZOVSTAL_STEEL_2022_03_01
Last reviewed2026-10-22
Schema version1.0.0
Tagsindustrial, steel, donetsk, mariupol, occupied

← Back to atlas map

← Atlas map