Chernihiv Oblast 330kV Transmission Substation
Підстанція 330 кВ Чернігівської області
Location
| Oblast | Chernihiv |
|---|---|
| Settlement | Chernihiv |
| Address | 330kV transmission substation, Chernihiv Oblast |
| Coordinates | 51.5021°N, 31.2885°E |
Damage Record
| Incident date | 2022-03-03 |
|---|---|
| Incident type | artillery shelling |
| Destruction level | Moderate (30–55%) |
| Re-damage count | 0 |
| Verified by | IEA, UA_GOV |
Evidence sources
Wartime Status
| Lifecycle stage | Assessed |
|---|---|
| Rebuildability | Rebuildable |
| Sovereign risk band | elevated |
| De-risking instruments | MIGA War & Civil Disturbance Insurance; EU Facility First-Loss Guarantee; EBRD Risk Sharing Facility |
Physical Specifications
| capacity mva | 400 MVA modelled |
|---|
Reconstruction Cost Estimates
Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.
Baseline
Repair to pre-war condition
Code-compliant
Rebuild to current EU/UA building codes
Build-back-better
Rebuild with technology overlays
Financing Structures
Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.
Baseline
Show full capital stack
| Tranche | % |
|---|---|
| Grant (Pillar I) | 10% |
| ERA / Frozen Assets | 5% |
| First-loss / Guarantee | 5% |
| Concessional IFI Debt | 25% |
| Senior IFI (near-mkt) | 20% |
| ECA-Covered Debt | 10% |
| DFI Equity / Quasi-eq. | 5% |
| Public / Municipal Eq. | 15% |
| Diaspora / Patriotic Bd | — |
| Commercial Bank Debt | 5% |
| Institutional Debt | — |
| Private Equity / Infra | — |
Political risk insurance (required): MIGA War & Civil Disturbance
ENERGY_BASELINE
Code-compliant
Show full capital stack
| Tranche | % |
|---|---|
| Grant (Pillar I) | 20% |
| ERA / Frozen Assets | 5% |
| First-loss / Guarantee | 5% |
| Concessional IFI Debt | 22% |
| Senior IFI (near-mkt) | 18% |
| ECA-Covered Debt | 10% |
| DFI Equity / Quasi-eq. | 5% |
| Public / Municipal Eq. | 12% |
| Diaspora / Patriotic Bd | — |
| Commercial Bank Debt | 3% |
| Institutional Debt | — |
| Private Equity / Infra | — |
Political risk insurance (required): MIGA War & Civil Disturbance
ENERGY_CODE_COMPLIANT
Build-back-better
EU Facility energy-security grant; EBRD Energy Resilience Fund; Chernihiv oblast is liberated and grid restoration is a priority; smart-grid upgrade qualifies for EU energy conditionality
Show full capital stack
| Tranche | % |
|---|---|
| Grant (Pillar I) | 30% |
| ERA / Frozen Assets | 5% |
| First-loss / Guarantee | 5% |
| Concessional IFI Debt | 22% |
| Senior IFI (near-mkt) | 15% |
| ECA-Covered Debt | 10% |
| DFI Equity / Quasi-eq. | 5% |
| Public / Municipal Eq. | 5% |
| Diaspora / Patriotic Bd | — |
| Commercial Bank Debt | 3% |
| Institutional Debt | — |
| Private Equity / Infra | — |
Political risk insurance (required): MIGA War & Civil Disturbance, EU Facility First-Loss
ENERGY_BBB
Record Metadata
| Asset ID | CHERNIHIV_POWER_SUBSTATION_2022_03_03 |
|---|---|
| Last reviewed | 2026-10-22 |
| Schema version | 1.0.0 |
| Tags | energy, substation, chernihiv_oblast, shelling, grid_critical, ukrenergo |