Chernihiv Oblast 330kV Transmission Substation

Підстанція 330 кВ Чернігівської області

Energy and Power energy.substation Assessed Rebuildable

Location

OblastChernihiv
SettlementChernihiv
Address330kV transmission substation, Chernihiv Oblast
Coordinates51.5021°N, 31.2885°E

View on OpenStreetMap ↗

Damage Record

Incident date2022-03-03
Incident typeartillery shelling
Destruction levelModerate (30–55%)
Re-damage count0
Verified byIEA, UA_GOV

Evidence sources

Wartime Status

Lifecycle stageAssessed
RebuildabilityRebuildable
Sovereign risk bandelevated
De-risking instrumentsMIGA War & Civil Disturbance Insurance; EU Facility First-Loss Guarantee; EBRD Risk Sharing Facility

Physical Specifications

capacity mva 400 MVA modelled

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 8.4M – USD 42M
Central: USD 25.2M

Code-compliant

Rebuild to current EU/UA building codes

USD 9.8M – USD 53.2M
Central: USD 30.8M

Build-back-better

Rebuild with technology overlays

USD 11.2M – USD 68.6M
Central: USD 39.2M
Technology overlays: smart grid automationdigital relay protection

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

10%5%5%25%20%10%5%15%5%
Show full capital stack
Tranche%
Grant (Pillar I)10%
ERA / Frozen Assets5%
First-loss / Guarantee5%
Concessional IFI Debt25%
Senior IFI (near-mkt)20%
ECA-Covered Debt10%
DFI Equity / Quasi-eq.5%
Public / Municipal Eq.15%
Diaspora / Patriotic Bd—
Commercial Bank Debt5%
Institutional Debt—
Private Equity / Infra—

Political risk insurance (required): MIGA War & Civil Disturbance

ENERGY_BASELINE

Code-compliant

20%5%5%22%18%10%5%12%3%
Show full capital stack
Tranche%
Grant (Pillar I)20%
ERA / Frozen Assets5%
First-loss / Guarantee5%
Concessional IFI Debt22%
Senior IFI (near-mkt)18%
ECA-Covered Debt10%
DFI Equity / Quasi-eq.5%
Public / Municipal Eq.12%
Diaspora / Patriotic Bd—
Commercial Bank Debt3%
Institutional Debt—
Private Equity / Infra—

Political risk insurance (required): MIGA War & Civil Disturbance

ENERGY_CODE_COMPLIANT

Build-back-better

30%5%5%22%15%10%5%5%3%

EU Facility energy-security grant; EBRD Energy Resilience Fund; Chernihiv oblast is liberated and grid restoration is a priority; smart-grid upgrade qualifies for EU energy conditionality

Show full capital stack
Tranche%
Grant (Pillar I)30%
ERA / Frozen Assets5%
First-loss / Guarantee5%
Concessional IFI Debt22%
Senior IFI (near-mkt)15%
ECA-Covered Debt10%
DFI Equity / Quasi-eq.5%
Public / Municipal Eq.5%
Diaspora / Patriotic Bd—
Commercial Bank Debt3%
Institutional Debt—
Private Equity / Infra—

Political risk insurance (required): MIGA War & Civil Disturbance, EU Facility First-Loss

ENERGY_BBB

Record Metadata

Asset IDCHERNIHIV_POWER_SUBSTATION_2022_03_03
Last reviewed2026-10-22
Schema version1.0.0
Tagsenergy, substation, chernihiv_oblast, shelling, grid_critical, ukrenergo