Dnipro Residential Apartment Block — Chechelivskiy District (January 2023 Missile Strike)

Житловий будинок у Чечелівському районі Дніпра (ракетний удар, січень 2023)

Residential residential.apartment_block_single Under reconstruction Rebuildable

Location

OblastDnipropetrovsk
SettlementDnipro
AddressChechelivskiy district, Dnipro, Dnipropetrovsk Oblast
Coordinates48.4647°N, 35.0462°E

View on OpenStreetMap ↗

Damage Record

Incident date2023-01-14
Incident typemissile strike
Destruction levelSevere (60–85%)
Re-damage count0
Verified byPRESS, UA_GOV, UN_OCHA

Evidence sources

Wartime Status

Lifecycle stageUnder reconstruction
RebuildabilityRebuildable
Sovereign risk bandelevated
De-risking instrumentsMIGA War & Civil Disturbance Insurance; EU Facility First-Loss Guarantee

Physical Specifications

floor area m2 42,000 m2 extracted from source
housing units 700 units extracted from source

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 23.4M – USD 78.3M
Central: USD 50.8M

Code-compliant

Rebuild to current EU/UA building codes

USD 27.5M – USD 97.6M
Central: USD 62M

Build-back-better

Rebuild with technology overlays

USD 30.5M – USD 125.1M
Central: USD 77.3M
Technology overlays: passive house standardenergy efficiency envelope

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

25%10%40%20%5%
Show full capital stack
Tranche%
Grant (Pillar I)25%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.20%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra5%

Political risk insurance (optional): MIGA War & Civil Disturbance

RESIDENTIAL_BASELINE

Code-compliant

35%10%5%30%15%5%
Show full capital stack
Tranche%
Grant (Pillar I)35%
ERA / Frozen Assets10%
First-loss / Guarantee5%
Concessional IFI Debt30%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.15%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra5%

Political risk insurance (optional): MIGA War & Civil Disturbance

RESIDENTIAL_CODE_COMPLIANT

Build-back-better

45%10%5%25%10%2%3%

Single high-rise building; eRecovery grant programme applicable for individual building; EU standard energy-efficiency upgrade qualifies for BBB track

Show full capital stack
Tranche%
Grant (Pillar I)45%
ERA / Frozen Assets10%
First-loss / Guarantee5%
Concessional IFI Debt25%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.10%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt2%
Private Equity / Infra3%

Political risk insurance (optional): MIGA War & Civil Disturbance

RESIDENTIAL_BBB

Record Metadata

Asset IDDNIPRO_RESIDENTIAL_2023_01_14
Last reviewed2026-10-22
Schema version1.0.0
Tagsresidential, dnipropetrovsk_oblast, missile_strike, apartment_blocks, single_building

← Back to atlas map

← Atlas map