Antonov Airport (Hostomel), Kyiv Oblast

Аеропорт Антонов, Гостомель

Transport and Ports transport.airport Assessed Rebuildable

Location

OblastKyiv
RaionBucha
SettlementHostomel
AddressAntonov Airport (UKKM), Hostomel, Bucha Raion, Kyiv Oblast
Coordinates50.5945°N, 30.1932°E

View on OpenStreetMap ↗

Damage Record

Incident date2022-02-24
Incident typeground combat
Destruction levelDestroyed (95–110%)
Re-damage count0
Verified byKSE, UA_GOV, UNOSAT

Evidence sources

Wartime Status

Lifecycle stageAssessed
RebuildabilityRebuildable
Sovereign risk bandelevated
De-risking instrumentsMIGA War & Civil Disturbance Insurance; UA Government Guarantee; EU Facility First-Loss Guarantee

Physical Specifications

runway length m 3,500 m extracted from source
hangar area m2 45,000 m2 estimated from photo
terminal area m2 8,000 m2 estimated from photo

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 18.2M – USD 56.7M
Central: USD 37.4M

Code-compliant

Rebuild to current EU/UA building codes

USD 20.3M – USD 70.6M
Central: USD 46M

Build-back-better

Rebuild with technology overlays

USD 23.5M – USD 90.9M
Central: USD 56.7M

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

10%5%20%25%10%15%15%
Show full capital stack
Tranche%
Grant (Pillar I)10%
ERA / Frozen Assets—
First-loss / Guarantee5%
Concessional IFI Debt20%
Senior IFI (near-mkt)25%
ECA-Covered Debt—
DFI Equity / Quasi-eq.10%
Public / Municipal Eq.—
Diaspora / Patriotic Bd—
Commercial Bank Debt15%
Institutional Debt—
Private Equity / Infra15%

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, ECA

TRANSPORT_REV_BASELINE

Code-compliant

15%5%20%25%10%15%10%
Show full capital stack
Tranche%
Grant (Pillar I)15%
ERA / Frozen Assets—
First-loss / Guarantee5%
Concessional IFI Debt20%
Senior IFI (near-mkt)25%
ECA-Covered Debt—
DFI Equity / Quasi-eq.10%
Public / Municipal Eq.—
Diaspora / Patriotic Bd—
Commercial Bank Debt15%
Institutional Debt—
Private Equity / Infra10%

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, ECA

TRANSPORT_REV_CODE_COMPLIANT

Build-back-better

20%5%20%20%10%15%10%

EU Connectivity Fund and TEN-T programme applicable to transport reconstruction; private concession model viable for airport and seaport; MIGA War & Civil Disturbance coverage for private tranche

Show full capital stack
Tranche%
Grant (Pillar I)20%
ERA / Frozen Assets—
First-loss / Guarantee5%
Concessional IFI Debt20%
Senior IFI (near-mkt)20%
ECA-Covered Debt—
DFI Equity / Quasi-eq.10%
Public / Municipal Eq.—
Diaspora / Patriotic Bd—
Commercial Bank Debt15%
Institutional Debt—
Private Equity / Infra10%

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, ECA

TRANSPORT_REV_BBB

Record Metadata

Asset IDHOSTOMEL_AIRPORT_2022_02_24
Last reviewed2026-10-22
Schema version1.0.0
Tagstransport, airport, hostomel, kyiv_oblast, ground_combat, strategic