Antonov Airport (Hostomel), Kyiv Oblast
Аеропорт Антонов, Гостомель
Location
| Oblast | Kyiv |
|---|---|
| Raion | Bucha |
| Settlement | Hostomel |
| Address | Antonov Airport (UKKM), Hostomel, Bucha Raion, Kyiv Oblast |
| Coordinates | 50.5945°N, 30.1932°E |
Damage Record
| Incident date | 2022-02-24 |
|---|---|
| Incident type | ground combat |
| Destruction level | Destroyed (95–110%) |
| Re-damage count | 0 |
| Verified by | KSE, UA_GOV, UNOSAT |
Evidence sources
Wartime Status
| Lifecycle stage | Assessed |
|---|---|
| Rebuildability | Rebuildable |
| Sovereign risk band | elevated |
| De-risking instruments | MIGA War & Civil Disturbance Insurance; UA Government Guarantee; EU Facility First-Loss Guarantee |
Physical Specifications
| runway length m | 3,500 m extracted from source |
|---|---|
| hangar area m2 | 45,000 m2 estimated from photo |
| terminal area m2 | 8,000 m2 estimated from photo |
Reconstruction Cost Estimates
Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.
Baseline
Repair to pre-war condition
Code-compliant
Rebuild to current EU/UA building codes
Build-back-better
Rebuild with technology overlays
Financing Structures
Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.
Baseline
Show full capital stack
| Tranche | % |
|---|---|
| Grant (Pillar I) | 10% |
| ERA / Frozen Assets | — |
| First-loss / Guarantee | 5% |
| Concessional IFI Debt | 20% |
| Senior IFI (near-mkt) | 25% |
| ECA-Covered Debt | — |
| DFI Equity / Quasi-eq. | 10% |
| Public / Municipal Eq. | — |
| Diaspora / Patriotic Bd | — |
| Commercial Bank Debt | 15% |
| Institutional Debt | — |
| Private Equity / Infra | 15% |
Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, ECA
TRANSPORT_REV_BASELINE
Code-compliant
Show full capital stack
| Tranche | % |
|---|---|
| Grant (Pillar I) | 15% |
| ERA / Frozen Assets | — |
| First-loss / Guarantee | 5% |
| Concessional IFI Debt | 20% |
| Senior IFI (near-mkt) | 25% |
| ECA-Covered Debt | — |
| DFI Equity / Quasi-eq. | 10% |
| Public / Municipal Eq. | — |
| Diaspora / Patriotic Bd | — |
| Commercial Bank Debt | 15% |
| Institutional Debt | — |
| Private Equity / Infra | 10% |
Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, ECA
TRANSPORT_REV_CODE_COMPLIANT
Build-back-better
EU Connectivity Fund and TEN-T programme applicable to transport reconstruction; private concession model viable for airport and seaport; MIGA War & Civil Disturbance coverage for private tranche
Show full capital stack
| Tranche | % |
|---|---|
| Grant (Pillar I) | 20% |
| ERA / Frozen Assets | — |
| First-loss / Guarantee | 5% |
| Concessional IFI Debt | 20% |
| Senior IFI (near-mkt) | 20% |
| ECA-Covered Debt | — |
| DFI Equity / Quasi-eq. | 10% |
| Public / Municipal Eq. | — |
| Diaspora / Patriotic Bd | — |
| Commercial Bank Debt | 15% |
| Institutional Debt | — |
| Private Equity / Infra | 10% |
Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, ECA
TRANSPORT_REV_BBB
Record Metadata
| Asset ID | HOSTOMEL_AIRPORT_2022_02_24 |
|---|---|
| Last reviewed | 2026-10-22 |
| Schema version | 1.0.0 |
| Tags | transport, airport, hostomel, kyiv_oblast, ground_combat, strategic |