Inhulets–Mykolaiv Water Supply System

Інгулецька водопостачальна система Миколаєва

⚠ Re-damaged 2 time(s) — material investor-information field
Water, Sanitation and Public Services water.supply Assessed Recently liberated

Location

OblastMykolaiv
SettlementMykolaiv
AddressInhulets River water intake and supply corridor, Mykolaiv Oblast
Coordinates46.9650°N, 32.0000°E

View on OpenStreetMap ↗

Damage Record

Incident date2022-03-01
Incident typeground combat
Destruction levelSevere (60–85%)
Re-damage count2 ⚠ Material investor-information field
Verified by

Evidence sources

  • KSE Ukraine damage assessment — Mykolaiv water crisis KSE

Wartime Status

Lifecycle stageAssessed
RebuildabilityRecently liberated
Sovereign risk bandelevated
De-risking instrumentsEBRD Risk Sharing Facility; EU Facility First-Loss Guarantee; UA Government Guarantee

Physical Specifications

pipeline length km 150 km extracted from source
capacity m3 per day 320,000 m³/day modelled

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 209.2M – USD 927.2M
Central: USD 568.2M

Code-compliant

Rebuild to current EU/UA building codes

USD 240.4M – USD 1,159.1M
Central: USD 699.7M

Build-back-better

Rebuild with technology overlays

USD 272.8M – USD 1,483.6M
Central: USD 877.6M

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

30%10%40%20%
Show full capital stack
Tranche%
Grant (Pillar I)30%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.20%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

WATER_BASELINE

Code-compliant

40%10%35%15%
Show full capital stack
Tranche%
Grant (Pillar I)40%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt35%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.15%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

WATER_CODE_COMPLIANT

Build-back-better

55%10%25%10%

EU Facility water sector track; smart metering and leak detection qualify for green conditionality; EBRD RSF applicable

Show full capital stack
Tranche%
Grant (Pillar I)55%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt25%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.10%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance, UK Export Finance

WATER_BBB

Record Metadata

Asset IDINHULETS_MYKOLAIV_WATER_2022_03_01
Last reviewed2026-10-22
Schema version1.0.0
Tagswater, mykolaiv, ground_combat, infrastructure

← Back to atlas map

← Atlas map