Kakhovka Hydroelectric Power Plant and Dam

Каховська гідроелектростанція та гребля

Energy and Power energy.hpp Assessed Occupied territory (pipeline only)

Location

OblastKherson
RaionBeryslav
SettlementNova Kakhovka
AddressKakhovka HPP, Nova Kakhovka, Kherson Oblast
Coordinates46.7667°N, 33.3833°E

View on OpenStreetMap ↗

Damage Record

Incident date2023-06-06
Incident typedeliberate demolition
Destruction levelDestroyed (95–110%)
Re-damage count0
Verified byKSE, PRESS, UN_OCHA

Evidence sources

Wartime Status

Lifecycle stageAssessed
RebuildabilityOccupied territory (pipeline only)
Sovereign risk bandsevere
De-risking instrumentsMIGA War & Civil Disturbance Insurance; EU Facility First-Loss Guarantee

Physical Specifications

installed capacity mw 334 MW extracted from source
dam length m 3,750 m extracted from source
reservoir area km2 2,155 km2 extracted from source
turbine units 6 units extracted from source

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 734.6M – USD 2,151.9M
Central: USD 1,444M

Code-compliant

Rebuild to current EU/UA building codes

USD 845.1M – USD 2,689.2M
Central: USD 1,767.2M

Build-back-better

Rebuild with technology overlays

USD 955.6M – USD 3,443.4M
Central: USD 2,199.5M
Technology overlays: run of river redesignfish passageflexible generationsmart grid integration

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

10%5%5%25%25%5%15%10%
Show full capital stack
Tranche%
Grant (Pillar I)10%
ERA / Frozen Assets5%
First-loss / Guarantee5%
Concessional IFI Debt25%
Senior IFI (near-mkt)25%
ECA-Covered Debt—
DFI Equity / Quasi-eq.5%
Public / Municipal Eq.15%
Diaspora / Patriotic Bd—
Commercial Bank Debt10%
Institutional Debt—
Private Equity / Infra—

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, BPIFrance Assurance Export

ENERGY_BASELINE

Code-compliant

20%5%5%25%20%5%15%5%
Show full capital stack
Tranche%
Grant (Pillar I)20%
ERA / Frozen Assets5%
First-loss / Guarantee5%
Concessional IFI Debt25%
Senior IFI (near-mkt)20%
ECA-Covered Debt—
DFI Equity / Quasi-eq.5%
Public / Municipal Eq.15%
Diaspora / Patriotic Bd—
Commercial Bank Debt5%
Institutional Debt—
Private Equity / Infra—

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, BPIFrance Assurance Export

ENERGY_CODE_COMPLIANT

Build-back-better

30%5%5%25%15%5%10%5%

Large-scale HPP reconstruction qualifies for EU Green Deal infrastructure grants and EBRD concessional lending. MIGA War & Civil Disturbance coverage likely required given occupied-territory status; reconstruction finance contingent on territorial control reversal.

Show full capital stack
Tranche%
Grant (Pillar I)30%
ERA / Frozen Assets5%
First-loss / Guarantee5%
Concessional IFI Debt25%
Senior IFI (near-mkt)15%
ECA-Covered Debt—
DFI Equity / Quasi-eq.5%
Public / Municipal Eq.10%
Diaspora / Patriotic Bd—
Commercial Bank Debt5%
Institutional Debt—
Private Equity / Infra—

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, BPIFrance Assurance Export

ENERGY_BBB

Record Metadata

Asset IDKAKHOVKA_HPP_2023_06_06
Last reviewed2026-10-22
Schema version1.0.0
Tagsenergy, hydropower, kherson, dam, deliberate_demolition, occupied, catastrophic