Kharkiv CHP-5 Combined Heat and Power Station
Харківська теплоелектроцентраль ТЕЦ-5
Location
| Oblast | Kharkiv |
|---|---|
| Settlement | Kharkiv |
| Address | CHP-5, Kharkiv, Kharkiv Oblast |
| Coordinates | 49.9950°N, 36.1800°E |
Damage Record
| Incident date | 2022-03-24 |
|---|---|
| Incident type | artillery shelling |
| Destruction level | Severe (60–85%) |
| Re-damage count | 4 ⚠ Material investor-information field |
| Verified by | KSE, UA_GOV, UN_OCHA |
Evidence sources
Wartime Status
| Lifecycle stage | Assessed |
|---|---|
| Rebuildability | Rebuildable |
| Sovereign risk band | elevated |
| De-risking instruments | MIGA War & Civil Disturbance Insurance; EU Facility First-Loss Guarantee |
Physical Specifications
| installed capacity mw | 540 MW extracted from source |
|---|
Reconstruction Cost Estimates
Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.
Baseline
Repair to pre-war condition
Code-compliant
Rebuild to current EU/UA building codes
Build-back-better
Rebuild with technology overlays
Financing Structures
Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.
Baseline
Show full capital stack
| Tranche | % |
|---|---|
| Grant (Pillar I) | 10% |
| ERA / Frozen Assets | 5% |
| First-loss / Guarantee | 5% |
| Concessional IFI Debt | 25% |
| Senior IFI (near-mkt) | 25% |
| ECA-Covered Debt | — |
| DFI Equity / Quasi-eq. | 5% |
| Public / Municipal Eq. | 15% |
| Diaspora / Patriotic Bd | — |
| Commercial Bank Debt | 10% |
| Institutional Debt | — |
| Private Equity / Infra | — |
Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, BPIFrance Assurance Export
ENERGY_BASELINE
Code-compliant
Show full capital stack
| Tranche | % |
|---|---|
| Grant (Pillar I) | 20% |
| ERA / Frozen Assets | 5% |
| First-loss / Guarantee | 5% |
| Concessional IFI Debt | 25% |
| Senior IFI (near-mkt) | 20% |
| ECA-Covered Debt | — |
| DFI Equity / Quasi-eq. | 5% |
| Public / Municipal Eq. | 15% |
| Diaspora / Patriotic Bd | — |
| Commercial Bank Debt | 5% |
| Institutional Debt | — |
| Private Equity / Infra | — |
Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, BPIFrance Assurance Export
ENERGY_CODE_COMPLIANT
Build-back-better
EU Facility energy-security track; EBRD Energy Efficiency and Resilience Facility; private co-investment (operator equity) credible for BBB path with carbon-transition roadmap
Show full capital stack
| Tranche | % |
|---|---|
| Grant (Pillar I) | 30% |
| ERA / Frozen Assets | 5% |
| First-loss / Guarantee | 5% |
| Concessional IFI Debt | 25% |
| Senior IFI (near-mkt) | 15% |
| ECA-Covered Debt | — |
| DFI Equity / Quasi-eq. | 5% |
| Public / Municipal Eq. | 10% |
| Diaspora / Patriotic Bd | — |
| Commercial Bank Debt | 5% |
| Institutional Debt | — |
| Private Equity / Infra | — |
Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, BPIFrance Assurance Export
ENERGY_BBB
Record Metadata
| Asset ID | KHARKIV_CHP_2022_03_24 |
|---|---|
| Last reviewed | 2026-10-22 |
| Schema version | 1.0.0 |
| Tags | energy, thermal_power, chp, district_heating, kharkiv, shelling, re_damaged, municipal |