Kharkiv Metro System — Infrastructure Damage

Харківський метрополітен — пошкодження

⚠ Re-damaged 5 time(s) — material investor-information field
Transport and Ports transport.rail_segment Funded Rebuildable

Location

OblastKharkiv
SettlementKharkiv
AddressKharkiv Metro System, Kharkiv
Coordinates49.9935°N, 36.2304°E

View on OpenStreetMap ↗

Damage Record

Incident date2022-02-24
Incident typeartillery shelling
Destruction levelModerate (30–55%)
Re-damage count5 ⚠ Material investor-information field
Verified byKSE, UA_GOV, UN_OCHA

Evidence sources

Wartime Status

Lifecycle stageFunded
RebuildabilityRebuildable
Sovereign risk bandelevated
De-risking instrumentsMIGA War & Civil Disturbance Insurance; EU Facility First-Loss Guarantee; EBRD Risk Sharing Facility

Physical Specifications

track length km 38.2 km extracted from source
stations 30 units extracted from source

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 24.6M – USD 201.2M
Central: USD 113.4M

Code-compliant

Rebuild to current EU/UA building codes

USD 27.8M – USD 252.5M
Central: USD 140.2M

Build-back-better

Rebuild with technology overlays

USD 32.1M – USD 323.1M
Central: USD 177.6M

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

30%10%40%20%
Show full capital stack
Tranche%
Grant (Pillar I)30%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.20%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

TRANSPORT_REV_BASELINE

Code-compliant

35%10%40%15%
Show full capital stack
Tranche%
Grant (Pillar I)35%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.15%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

TRANSPORT_REV_CODE_COMPLIANT

Build-back-better

40%10%40%10%

EU Connectivity Fund and TEN-T programme applicable to transport reconstruction; private concession model viable for airport and seaport; MIGA War & Civil Disturbance coverage for private tranche

Show full capital stack
Tranche%
Grant (Pillar I)40%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.10%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

TRANSPORT_REV_BBB

Record Metadata

Asset IDKHARKIV_METRO_2022_03_01
Last reviewed2026-10-22
Schema version1.0.0
Tagstransport, rail, metro, kharkiv_oblast, shelling, re_damaged, civilian_shelter

← Back to atlas map

← Atlas map