Kharkiv Metro Line 1 — Kholodna Hora to Rozkidna Infrastructure

Харківський метрополітен, лінія 1 — Холодна Гора — Розкидна

Transport and Ports transport.rail_segment Under reconstruction Rebuildable

Location

OblastKharkiv
SettlementKharkiv
AddressMetro Line 1 (Kholodna Hora – Rozkidna), Kharkiv, Kharkiv Oblast
Coordinates49.9925°N, 36.2311°E

View on OpenStreetMap ↗

Damage Record

Incident date2022-04-01
Incident typeartillery shelling
Destruction levelModerate (30–55%)
Re-damage count0
Verified byKSE, PRESS, UA_GOV

Evidence sources

Wartime Status

Lifecycle stageUnder reconstruction
RebuildabilityRebuildable
Sovereign risk bandelevated
De-risking instrumentsEBRD Risk Sharing Facility; EU Facility First-Loss Guarantee; MIGA War & Civil Disturbance Insurance

Physical Specifications

track length km 17.3 km extracted from source
stations 16 units extracted from source

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 10.7M – USD 90.9M
Central: USD 51.4M

Code-compliant

Rebuild to current EU/UA building codes

USD 12.8M – USD 114.5M
Central: USD 63.1M

Build-back-better

Rebuild with technology overlays

USD 13.9M – USD 146.6M
Central: USD 80.2M
Technology overlays: etcs signallingsmart station systemsenergy recovery braking

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

30%10%40%5%15%
Show full capital stack
Tranche%
Grant (Pillar I)30%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt5%
DFI Equity / Quasi-eq.—
Public / Municipal Eq.15%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

TRANSPORT_NONREV_BASELINE

Code-compliant

35%10%35%8%12%
Show full capital stack
Tranche%
Grant (Pillar I)35%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt35%
Senior IFI (near-mkt)—
ECA-Covered Debt8%
DFI Equity / Quasi-eq.—
Public / Municipal Eq.12%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

TRANSPORT_NONREV_CODE_COMPLIANT

Build-back-better

40%10%30%10%10%

EU Connectivity Fund and TEN-T integration applicable; EBRD RSF active for Kharkiv metro; Line 1 under-reconstruction status indicates financing pipeline is active; ETCS and smart-station upgrades qualify for EU TEN-T conditionality

Show full capital stack
Tranche%
Grant (Pillar I)40%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt30%
Senior IFI (near-mkt)—
ECA-Covered Debt10%
DFI Equity / Quasi-eq.—
Public / Municipal Eq.10%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance, EBRD RSF

TRANSPORT_NONREV_BBB

Record Metadata

Asset IDKHARKIV_METRO_LINE1_2022_04_01
Last reviewed2026-10-22
Schema version1.0.0
Tagstransport, metro, rail, kharkiv_oblast, shelling, under_reconstruction

← Back to atlas map

← Atlas map