Kherson City Water Treatment Plant (Post-Liberation Damage)

Міська станція водопідготовки Херсона (пошкодження після деокупації)

Water, Sanitation and Public Services water.treatment Assessed Rebuildable

Location

OblastKherson
SettlementKherson
AddressKherson city water treatment plant, Kherson, Kherson Oblast
Coordinates46.6249°N, 32.6147°E

View on OpenStreetMap ↗

Damage Record

Incident date2022-11-01
Incident typemultiple
Destruction levelModerate (30–55%)
Re-damage count0
Verified byUA_GOV, UN_OCHA

Evidence sources

Wartime Status

Lifecycle stageAssessed
RebuildabilityRebuildable
Sovereign risk bandelevated
De-risking instrumentsMIGA War & Civil Disturbance Insurance; UA Government Guarantee; EU Facility First-Loss Guarantee

Physical Specifications

capacity m3 per day 120,000 m3/day modelled

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 53.9M – USD 321.3M
Central: USD 187.6M

Code-compliant

Rebuild to current EU/UA building codes

USD 61.5M – USD 401.1M
Central: USD 231.8M

Build-back-better

Rebuild with technology overlays

USD 70.1M – USD 513.2M
Central: USD 291.1M
Technology overlays: smart water meteringenergy efficient pumpingleak detection

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

25%10%40%8%17%
Show full capital stack
Tranche%
Grant (Pillar I)25%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt8%
DFI Equity / Quasi-eq.—
Public / Municipal Eq.17%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

WATER_BASELINE

Code-compliant

35%10%33%8%14%
Show full capital stack
Tranche%
Grant (Pillar I)35%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt33%
Senior IFI (near-mkt)—
ECA-Covered Debt8%
DFI Equity / Quasi-eq.—
Public / Municipal Eq.14%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

WATER_CODE_COMPLIANT

Build-back-better

45%8%22%8%12%5%

EU Facility water sector BBB track; EBRD Green Cities Kherson applicable; smart metering and energy-efficiency overlays unlock maximum grant share; UA guarantee required given Kherson risk environment

Show full capital stack
Tranche%
Grant (Pillar I)45%
ERA / Frozen Assets8%
First-loss / Guarantee—
Concessional IFI Debt22%
Senior IFI (near-mkt)—
ECA-Covered Debt8%
DFI Equity / Quasi-eq.—
Public / Municipal Eq.12%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt5%
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

WATER_BBB

Record Metadata

Asset IDKHERSON_OLESHKY_WATER_PLANT_2022_11_01
Last reviewed2026-10-22
Schema version1.0.0
Tagswater, water_treatment, kherson_oblast, liberated, multiple

← Back to atlas map

← Atlas map