Kherson City Water and Sanitation System (post-Kakhovka)
Система водопостачання та водовідведення Херсона (після руйнування Каховської ГЕС)
Location
| Oblast | Kherson |
|---|---|
| Settlement | Kherson |
| Address | Kherson city water infrastructure, Kherson Oblast |
| Coordinates | 46.6354°N, 32.6169°E |
Damage Record
| Incident date | 2023-06-06 |
|---|---|
| Incident type | sabotage |
| Destruction level | Severe (60–85%) |
| Re-damage count | 0 |
| Verified by |
Evidence sources
- UN OCHA Ukraine Flash Update #49 — Kakhovka dam collapse OCHA
Wartime Status
| Lifecycle stage | Assessed |
|---|---|
| Rebuildability | Frontline adjacent (pipeline only) |
| Sovereign risk band | severe |
| De-risking instruments | EBRD Risk Sharing Facility; EU Facility First-Loss Guarantee |
Physical Specifications
| service population | 290,000 people extracted from source |
|---|---|
| treatment capacity m3 per day | — m³/day pending data |
Reconstruction Cost Estimates
Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.
Baseline
Repair to pre-war condition
Code-compliant
Rebuild to current EU/UA building codes
Build-back-better
Rebuild with technology overlays
Financing Structures
Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.
Baseline
Show full capital stack
| Tranche | % |
|---|---|
| Grant (Pillar I) | 30% |
| ERA / Frozen Assets | 10% |
| First-loss / Guarantee | — |
| Concessional IFI Debt | 40% |
| Senior IFI (near-mkt) | — |
| ECA-Covered Debt | — |
| DFI Equity / Quasi-eq. | — |
| Public / Municipal Eq. | 20% |
| Diaspora / Patriotic Bd | — |
| Commercial Bank Debt | — |
| Institutional Debt | — |
| Private Equity / Infra | — |
Political risk insurance (optional): MIGA War & Civil Disturbance
WATER_BASELINE
Code-compliant
Show full capital stack
| Tranche | % |
|---|---|
| Grant (Pillar I) | 40% |
| ERA / Frozen Assets | 10% |
| First-loss / Guarantee | — |
| Concessional IFI Debt | 35% |
| Senior IFI (near-mkt) | — |
| ECA-Covered Debt | — |
| DFI Equity / Quasi-eq. | — |
| Public / Municipal Eq. | 15% |
| Diaspora / Patriotic Bd | — |
| Commercial Bank Debt | — |
| Institutional Debt | — |
| Private Equity / Infra | — |
Political risk insurance (optional): MIGA War & Civil Disturbance
WATER_CODE_COMPLIANT
Build-back-better
EU Facility water sector track; smart metering and leak detection qualify for green conditionality; EBRD RSF applicable
Show full capital stack
| Tranche | % |
|---|---|
| Grant (Pillar I) | 55% |
| ERA / Frozen Assets | 10% |
| First-loss / Guarantee | — |
| Concessional IFI Debt | 25% |
| Senior IFI (near-mkt) | — |
| ECA-Covered Debt | — |
| DFI Equity / Quasi-eq. | — |
| Public / Municipal Eq. | 10% |
| Diaspora / Patriotic Bd | — |
| Commercial Bank Debt | — |
| Institutional Debt | — |
| Private Equity / Infra | — |
Political risk insurance (optional): MIGA War & Civil Disturbance, UK Export Finance
WATER_BBB
Record Metadata
| Asset ID | KHERSON_POST_KAKHOVKA_WATER_2023_06_06 |
|---|---|
| Last reviewed | 2026-10-22 |
| Schema version | 1.0.0 |
| Tags | water, kherson, kakhovka, sabotage |