Kherson Shipyard (Khersonsky Sudnobudivny Zavod)

Херсонський суднобудівний завод

⚠ Re-damaged 3 time(s) — material investor-information field
Industrial and Agricultural transport.shipyard Assessed Rebuildable

Location

OblastKherson
RaionKherson
SettlementKherson
AddressKhersonsky Sudnobudivny Zavod, Kherson, Kherson Oblast
Coordinates46.6303°N, 32.6249°E

View on OpenStreetMap ↗

Damage Record

Incident date2022-11-11
Incident typeartillery shelling
Destruction levelSevere (60–85%)
Re-damage count3 ⚠ Material investor-information field
Verified byKSE, UNOSAT, UN_OCHA

Evidence sources

Wartime Status

Lifecycle stageAssessed
RebuildabilityRebuildable
Sovereign risk bandelevated
De-risking instrumentsMIGA War & Civil Disturbance Insurance; UK Export Finance; UA Government Guarantee

Physical Specifications

site area ha 42 ha extracted from source
dry dock capacity tonnes 7,000 tonnes displacement extracted from source

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 92.2M – USD 256M
Central: USD 174.1M

Code-compliant

Rebuild to current EU/UA building codes

USD 106.4M – USD 320M
Central: USD 212.7M

Build-back-better

Rebuild with technology overlays

USD 119.5M – USD 402.8M
Central: USD 261.6M
Technology overlays: process electrificationmodular prefabricationsmart manufacturingenergy management system

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

20%30%20%30%
Show full capital stack
Tranche%
Grant (Pillar I)20%
ERA / Frozen Assets—
First-loss / Guarantee—
Concessional IFI Debt30%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.—
Diaspora / Patriotic Bd—
Commercial Bank Debt20%
Institutional Debt—
Private Equity / Infra30%

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance

INDUSTRIAL_BASELINE

Code-compliant

20%30%20%30%
Show full capital stack
Tranche%
Grant (Pillar I)20%
ERA / Frozen Assets—
First-loss / Guarantee—
Concessional IFI Debt30%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.—
Diaspora / Patriotic Bd—
Commercial Bank Debt20%
Institutional Debt—
Private Equity / Infra30%

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance

INDUSTRIAL_CODE_COMPLIANT

Build-back-better

20%30%20%30%

Historic Dnipro shipyard; strategic for reconstruction logistics and post-war maritime recovery; private equity and ECA-backed commercial debt dominant; EU industrial reconstruction grant element tied to green manufacturing overlays

Show full capital stack
Tranche%
Grant (Pillar I)20%
ERA / Frozen Assets—
First-loss / Guarantee—
Concessional IFI Debt30%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.—
Diaspora / Patriotic Bd—
Commercial Bank Debt20%
Institutional Debt—
Private Equity / Infra30%

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance

INDUSTRIAL_BBB

Record Metadata

Asset IDKHERSON_SHIPYARD_2022_11_11
Last reviewed2026-10-22
Schema version1.0.0
Tagsindustrial, shipyard, kherson, artillery_strike, severe, re_damaged

← Back to atlas map

← Atlas map