Kremenchuk Kremenchutskyi Oil Refinery Complex

Кременчуцький нафтопереробний завод

⚠ Re-damaged 2 time(s) — material investor-information field
Energy and Power energy.refinery Assessed Rebuildable

Location

OblastPoltava
RaionKremenchuk
SettlementKremenchuk
AddressKremenchuk Oil Refinery, Kremenchuk, Poltava Oblast
Coordinates49.0882°N, 33.4117°E

View on OpenStreetMap ↗

Damage Record

Incident date2022-06-27
Incident typemissile strike
Destruction levelSevere (60–85%)
Re-damage count2 ⚠ Material investor-information field
Verified byHRW, KSE, UN_OCHA

Evidence sources

Wartime Status

Lifecycle stageAssessed
RebuildabilityRebuildable
Sovereign risk bandelevated
De-risking instrumentsMIGA War & Civil Disturbance Insurance; UK Export Finance; UA Government Guarantee

Physical Specifications

processing capacity mtpa 18 million tonnes per annum extracted from source
site area ha 680 ha extracted from source

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 1,091.4M – USD 2,378.6M
Central: USD 1,735M

Code-compliant

Rebuild to current EU/UA building codes

USD 1,255.1M – USD 2,973.3M
Central: USD 2,082M

Build-back-better

Rebuild with technology overlays

USD 1,418.8M – USD 3,567.9M
Central: USD 2,504.5M
Technology overlays: low sulphur compliancewaste heat recoveryprocess electrificationsmart monitoring

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

20%30%20%30%
Show full capital stack
Tranche%
Grant (Pillar I)20%
ERA / Frozen Assets—
First-loss / Guarantee—
Concessional IFI Debt30%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.—
Diaspora / Patriotic Bd—
Commercial Bank Debt20%
Institutional Debt—
Private Equity / Infra30%

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance

INDUSTRIAL_BASELINE

Code-compliant

20%30%20%30%
Show full capital stack
Tranche%
Grant (Pillar I)20%
ERA / Frozen Assets—
First-loss / Guarantee—
Concessional IFI Debt30%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.—
Diaspora / Patriotic Bd—
Commercial Bank Debt20%
Institutional Debt—
Private Equity / Infra30%

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance

INDUSTRIAL_CODE_COMPLIANT

Build-back-better

20%30%20%30%

Private-sector-led reconstruction with EBRD/IFC equity co-investment; ECA coverage from UKEF required for commercial lender participation; EU grant element tied to green process upgrades

Show full capital stack
Tranche%
Grant (Pillar I)20%
ERA / Frozen Assets—
First-loss / Guarantee—
Concessional IFI Debt30%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.—
Diaspora / Patriotic Bd—
Commercial Bank Debt20%
Institutional Debt—
Private Equity / Infra30%

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance

INDUSTRIAL_BBB

Record Metadata

Asset IDKREMENCHUK_KREMEN_OIL_REFINERY_2022_06_27
Last reviewed2026-10-22
Schema version1.0.0
Tagsenergy, refinery, poltava, kremenchuk, missile_strike, industrial

← Back to atlas map

← Atlas map