Kremenchuk Stroymash Engineering Plant
Кременчуцький завод Stroymash (будівельного машинобудування)
Location
| Oblast | Poltava |
|---|---|
| Raion | Kremenchuk |
| Settlement | Kremenchuk |
| Address | Stroymash Engineering Plant, Kremenchuk, Poltava Oblast |
| Coordinates | 49.0701°N, 33.4089°E |
Damage Record
| Incident date | 2022-06-27 |
|---|---|
| Incident type | missile strike |
| Destruction level | Destroyed (95–110%) |
| Re-damage count | 1 |
| Verified by | KSE, PRESS, UN_OCHA |
Evidence sources
Wartime Status
| Lifecycle stage | Assessed |
|---|---|
| Rebuildability | Rebuildable |
| Sovereign risk band | elevated |
| De-risking instruments | MIGA War & Civil Disturbance Insurance; UK Export Finance; UA Government Guarantee |
Physical Specifications
| floor area m2 | 48,000 m2 extracted from source |
|---|---|
| production capacity tonnes year | 12,000 tonnes/year estimated from photo |
Reconstruction Cost Estimates
Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.
Baseline
Repair to pre-war condition
Code-compliant
Rebuild to current EU/UA building codes
Build-back-better
Rebuild with technology overlays
Financing Structures
Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.
Baseline
Show full capital stack
| Tranche | % |
|---|---|
| Grant (Pillar I) | 20% |
| ERA / Frozen Assets | — |
| First-loss / Guarantee | — |
| Concessional IFI Debt | 30% |
| Senior IFI (near-mkt) | — |
| ECA-Covered Debt | — |
| DFI Equity / Quasi-eq. | — |
| Public / Municipal Eq. | — |
| Diaspora / Patriotic Bd | — |
| Commercial Bank Debt | 20% |
| Institutional Debt | — |
| Private Equity / Infra | 30% |
Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance
INDUSTRIAL_BASELINE
Code-compliant
Show full capital stack
| Tranche | % |
|---|---|
| Grant (Pillar I) | 20% |
| ERA / Frozen Assets | — |
| First-loss / Guarantee | — |
| Concessional IFI Debt | 30% |
| Senior IFI (near-mkt) | — |
| ECA-Covered Debt | — |
| DFI Equity / Quasi-eq. | — |
| Public / Municipal Eq. | — |
| Diaspora / Patriotic Bd | — |
| Commercial Bank Debt | 20% |
| Institutional Debt | — |
| Private Equity / Infra | 30% |
Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance
INDUSTRIAL_CODE_COMPLIANT
Build-back-better
Industrial plant with private-sector operator; private equity and commercial debt dominant; UKEF and MIGA wrap required for international commercial lender participation; EU grant element for green process upgrade
Show full capital stack
| Tranche | % |
|---|---|
| Grant (Pillar I) | 20% |
| ERA / Frozen Assets | — |
| First-loss / Guarantee | — |
| Concessional IFI Debt | 30% |
| Senior IFI (near-mkt) | — |
| ECA-Covered Debt | — |
| DFI Equity / Quasi-eq. | — |
| Public / Municipal Eq. | — |
| Diaspora / Patriotic Bd | — |
| Commercial Bank Debt | 20% |
| Institutional Debt | — |
| Private Equity / Infra | 30% |
Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance
INDUSTRIAL_BBB
Record Metadata
| Asset ID | KREMENCHUK_STROYMASH_PLANT_2022_06_27 |
|---|---|
| Last reviewed | 2026-10-22 |
| Schema version | 1.0.0 |
| Tags | industrial, engineering, poltava, kremenchuk, missile_strike, destroyed |