Kupyansk Residential District

Жилий масив Куп'янськ

⚠ Re-damaged 2 time(s) — material investor-information field
Residential residential.apartment_block_district Assessed Frontline adjacent (pipeline only)

Location

OblastKharkiv
RaionKupyansk
SettlementKupyansk
AddressKupyansk, Kharkiv Oblast
Coordinates49.7098°N, 37.5998°E

View on OpenStreetMap ↗

Damage Record

Incident date2022-02-28
Incident typeartillery shelling
Destruction levelSevere (60–85%)
Re-damage count2 ⚠ Material investor-information field
Verified byKSE, UA_GOV, UN_OCHA

Evidence sources

Wartime Status

Lifecycle stageAssessed
RebuildabilityFrontline adjacent (pipeline only)
Sovereign risk bandelevated
De-risking instrumentsMIGA War & Civil Disturbance Insurance

Physical Specifications

total floor area m2 180,000 m2 estimated from photo
housing units 1,800 units estimated from photo

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 108.8M – USD 348.8M
Central: USD 228.8M

Code-compliant

Rebuild to current EU/UA building codes

USD 125.1M – USD 436.3M
Central: USD 280.7M

Build-back-better

Rebuild with technology overlays

USD 141.4M – USD 558.3M
Central: USD 349.8M

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

25%10%40%20%5%
Show full capital stack
Tranche%
Grant (Pillar I)25%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.20%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra5%

Political risk insurance (optional): MIGA War & Civil Disturbance

RESIDENTIAL_BASELINE

Code-compliant

35%10%5%30%15%5%
Show full capital stack
Tranche%
Grant (Pillar I)35%
ERA / Frozen Assets10%
First-loss / Guarantee5%
Concessional IFI Debt30%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.15%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra5%

Political risk insurance (optional): MIGA War & Civil Disturbance

RESIDENTIAL_CODE_COMPLIANT

Build-back-better

45%10%5%25%10%5%

EU Facility housing reconstruction track; prefab-modular and passive-standard overlays qualify; municipal co-investment required

Show full capital stack
Tranche%
Grant (Pillar I)45%
ERA / Frozen Assets10%
First-loss / Guarantee5%
Concessional IFI Debt25%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.10%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra5%

Political risk insurance (optional): MIGA War & Civil Disturbance

RESIDENTIAL_BBB

Record Metadata

Asset IDKUPYANSK_RESIDENTIAL_2022_02_28
Last reviewed2026-10-22
Schema version1.0.0
Tagsresidential, kharkiv_oblast, kupyansk, shelling, frontline, re_damaged

← Back to atlas map

← Atlas map