Lyman Water Treatment Plant

Лиманська станція водопідготовки

⚠ Re-damaged 2 time(s) — material investor-information field
Water, Sanitation and Public Services water.treatment Documented Recently liberated

Location

OblastDonetsk
RaionKramatorsk
SettlementLyman
AddressLyman Water Treatment Plant, Lyman, Donetsk Oblast
Coordinates48.9735°N, 37.8023°E

View on OpenStreetMap ↗

Damage Record

Incident date2022-05-01
Incident typeartillery shelling
Destruction levelDestroyed (95–110%)
Re-damage count2 ⚠ Material investor-information field
Verified byKSE, UN_OCHA

Evidence sources

Wartime Status

Lifecycle stageDocumented
RebuildabilityRecently liberated
Sovereign risk bandsevere
De-risking instrumentsMIGA War & Civil Disturbance Insurance; EU Facility First-Loss Guarantee

Physical Specifications

treatment capacity m3 day 24,000 m³/day extracted from source
population served 42,000 persons extracted from source

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 15.1M – USD 38.8M
Central: USD 27M

Code-compliant

Rebuild to current EU/UA building codes

USD 17.3M – USD 48.5M
Central: USD 33.4M

Build-back-better

Rebuild with technology overlays

USD 19.4M – USD 62.5M
Central: USD 41M
Technology overlays: smart water meteringenergy efficient pumpingmembrane filtrationmicrogrid

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

50%5%35%10%
Show full capital stack
Tranche%
Grant (Pillar I)50%
ERA / Frozen Assets5%
First-loss / Guarantee—
Concessional IFI Debt35%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.10%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

WATER_BASELINE

Code-compliant

55%5%30%10%
Show full capital stack
Tranche%
Grant (Pillar I)55%
ERA / Frozen Assets5%
First-loss / Guarantee—
Concessional IFI Debt30%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.10%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

WATER_CODE_COMPLIANT

Build-back-better

60%5%25%10%

Essential WASH infrastructure in recently liberated Donetsk Oblast; EU water-sector reconstruction grants and UNICEF/ICRC humanitarian investment applicable; smart metering reduces long-term OpEx

Show full capital stack
Tranche%
Grant (Pillar I)60%
ERA / Frozen Assets5%
First-loss / Guarantee—
Concessional IFI Debt25%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.10%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance, EU Facility First-Loss

WATER_BBB

Record Metadata

Asset IDLYMAN_WATER_TREATMENT_2022_05_01
Last reviewed2026-10-22
Schema version1.0.0
Tagswater, sanitation, donetsk, lyman, artillery_strike, destroyed, recently_liberated

← Back to atlas map

← Atlas map