Mariupol School No. 89

Маріупольська школа №89

Education education.primary_school Documented Occupied territory (pipeline only)

Location

OblastDonetsk
RaionMariupol
SettlementMariupol
AddressSchool No. 89, Mariupol, Donetsk Oblast
Coordinates47.1031°N, 37.5687°E

View on OpenStreetMap ↗

Damage Record

Incident date2022-03-01
Incident typeartillery shelling
Destruction levelDestroyed (95–110%)
Re-damage count0
Verified byKSE, UN_OCHA

Evidence sources

Wartime Status

Lifecycle stageDocumented
RebuildabilityOccupied territory (pipeline only)
Sovereign risk bandsevere
De-risking instrumentsMIGA War & Civil Disturbance Insurance; EU Facility First-Loss Guarantee

Physical Specifications

floor area m2 3,800 m2 estimated from photo
student capacity 900 students extracted from source

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 6.5M – USD 17.3M
Central: USD 11.9M

Code-compliant

Rebuild to current EU/UA building codes

USD 7.5M – USD 21.6M
Central: USD 14M

Build-back-better

Rebuild with technology overlays

USD 8.6M – USD 25.9M
Central: USD 17.3M
Technology overlays: passive house standardmicrogridfibremass timber

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

50%10%30%10%
Show full capital stack
Tranche%
Grant (Pillar I)50%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt30%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.10%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

EDUCATION_BASELINE

Code-compliant

55%10%25%10%
Show full capital stack
Tranche%
Grant (Pillar I)55%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt25%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.10%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

EDUCATION_CODE_COMPLIANT

Build-back-better

60%10%20%10%

Occupied territory; reconstruction contingent on liberation; high grant-eligibility under EU education reconstruction programmes once territory restored

Show full capital stack
Tranche%
Grant (Pillar I)60%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt20%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.10%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance, EU Facility First-Loss

EDUCATION_BBB

Record Metadata

Asset IDMARIUPOL_SCHOOL_89_2022_03_01
Last reviewed2026-10-22
Schema version1.0.0
Tagseducation, primary_school, mariupol, donetsk, artillery_strike, destroyed, occupied

← Back to atlas map

← Atlas map