Mariupol Water Supply and Wastewater Treatment System

Система водопостачання та водовідведення Маріуполя

Water, Sanitation and Public Services water.supply In pipeline Occupied territory (pipeline only)

Location

OblastDonetsk
SettlementMariupol
AddressMariupol city water infrastructure, Donetsk Oblast
Coordinates47.0958°N, 37.5421°E

View on OpenStreetMap ↗

Damage Record

Incident date2022-03-01
Incident typeartillery shelling
Destruction levelDestroyed (95–110%)
Re-damage count0
Verified by

Evidence sources

  • KSE Russia Will Pay — Mariupol infrastructure KSE

Wartime Status

Lifecycle stageIn pipeline
RebuildabilityOccupied territory (pipeline only)
Sovereign risk bandsevere
De-risking instrumentsNone identified

Physical Specifications

service population 430,000 people extracted from source
treatment capacity m3 per day — m³/day pending data

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 506.7M – USD 1,870.7M
Central: USD 1,188.2M

Code-compliant

Rebuild to current EU/UA building codes

USD 582.2M – USD 2,338.6M
Central: USD 1,460.9M

Build-back-better

Rebuild with technology overlays

USD 658.8M – USD 2,993.1M
Central: USD 1,826.5M

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

30%10%40%20%
Show full capital stack
Tranche%
Grant (Pillar I)30%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.20%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

WATER_BASELINE

Code-compliant

40%10%35%15%
Show full capital stack
Tranche%
Grant (Pillar I)40%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt35%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.15%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

WATER_CODE_COMPLIANT

Build-back-better

55%10%25%10%

EU Facility water sector track; smart metering and leak detection qualify for green conditionality; EBRD RSF applicable

Show full capital stack
Tranche%
Grant (Pillar I)55%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt25%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.10%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance, UK Export Finance

WATER_BBB

Record Metadata

Asset IDMARIUPOL_WATER_WASTEWATER_2022_03_01
Last reviewed2026-10-22
Schema version1.0.0
Tagswater, donetsk, mariupol, artillery_strike, occupied

← Back to atlas map

← Atlas map