Mykolaiv Central Residential District

Центральний житловий масив, Миколаїв

⚠ Re-damaged 6 time(s) — material investor-information field
Residential residential.apartment_block_district Under reconstruction Rebuildable

Location

OblastMykolaiv
SettlementMykolaiv
AddressCentral Residential District, Mykolaiv
Coordinates46.9750°N, 31.9940°E

View on OpenStreetMap ↗

Damage Record

Incident date2022-08-01
Incident typeartillery shelling
Destruction levelModerate (30–55%)
Re-damage count6 ⚠ Material investor-information field
Verified byKSE, UA_GOV, UN_OCHA

Evidence sources

Wartime Status

Lifecycle stageUnder reconstruction
RebuildabilityRebuildable
Sovereign risk bandelevated
De-risking instrumentsMIGA War & Civil Disturbance Insurance; EU Facility First-Loss Guarantee

Physical Specifications

total floor area m2 650,000 m2 estimated from photo
housing units 6,500 units estimated from photo

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 188.1M – USD 784.1M
Central: USD 486.1M

Code-compliant

Rebuild to current EU/UA building codes

USD 216.6M – USD 980.3M
Central: USD 598M

Build-back-better

Rebuild with technology overlays

USD 245.1M – USD 1,253.9M
Central: USD 749.5M

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

25%10%40%20%5%
Show full capital stack
Tranche%
Grant (Pillar I)25%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.20%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra5%

Political risk insurance (optional): MIGA War & Civil Disturbance

RESIDENTIAL_BASELINE

Code-compliant

35%10%5%30%15%5%
Show full capital stack
Tranche%
Grant (Pillar I)35%
ERA / Frozen Assets10%
First-loss / Guarantee5%
Concessional IFI Debt30%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.15%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra5%

Political risk insurance (optional): MIGA War & Civil Disturbance

RESIDENTIAL_CODE_COMPLIANT

Build-back-better

45%10%5%25%10%5%

EU Facility housing reconstruction track; prefab-modular and passive-standard overlays qualify; municipal co-investment required

Show full capital stack
Tranche%
Grant (Pillar I)45%
ERA / Frozen Assets10%
First-loss / Guarantee5%
Concessional IFI Debt25%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.10%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra5%

Political risk insurance (optional): MIGA War & Civil Disturbance

RESIDENTIAL_BBB

Record Metadata

Asset IDMYKOLAIV_RESIDENTIAL_2022_08_01
Last reviewed2026-10-22
Schema version1.0.0
Tagsresidential, mykolaiv, shelling, re_damaged