Mykolaiv Shipbuilding Facilities — Black Sea Shipyard / NIBULON complex

Чорноморський суднобудівний завод / комплекс НІБУЛОН, Миколаїв

⚠ Re-damaged 4 time(s) — material investor-information field
Transport and Ports transport.shipyard Assessed Rebuildable

Location

OblastMykolaiv
SettlementMykolaiv
AddressBlack Sea Shipyard, Mykolaiv (Chornomore Sudn. Zavod)
Coordinates46.9680°N, 32.0380°E

View on OpenStreetMap ↗

Damage Record

Incident date2022-03-01
Incident typeartillery shelling
Destruction levelSevere (60–85%)
Re-damage count4 ⚠ Material investor-information field
Verified byKSE, UA_GOV, UN_OCHA

Evidence sources

Wartime Status

Lifecycle stageAssessed
RebuildabilityRebuildable
Sovereign risk bandelevated
De-risking instrumentsMIGA War & Civil Disturbance Insurance; EU Facility First-Loss Guarantee

Physical Specifications

berth length m 2,800 m estimated from photo
storage area m2 120,000 m2 estimated from photo

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 4.3M – USD 18.2M
Central: USD 10.7M

Code-compliant

Rebuild to current EU/UA building codes

USD 4.3M – USD 22.5M
Central: USD 13.9M

Build-back-better

Rebuild with technology overlays

USD 5.3M – USD 28.9M
Central: USD 17.1M

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

30%10%40%20%
Show full capital stack
Tranche%
Grant (Pillar I)30%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.20%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

TRANSPORT_REV_BASELINE

Code-compliant

35%10%40%15%
Show full capital stack
Tranche%
Grant (Pillar I)35%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.15%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

TRANSPORT_REV_CODE_COMPLIANT

Build-back-better

40%10%40%10%

EU Connectivity Fund and TEN-T programme applicable to transport reconstruction; private concession model viable for airport and seaport; MIGA War & Civil Disturbance coverage for private tranche

Show full capital stack
Tranche%
Grant (Pillar I)40%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.10%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

TRANSPORT_REV_BBB

Record Metadata

Asset IDMYKOLAIV_SHIPYARDS_2022_03_01
Last reviewed2026-10-22
Schema version1.0.0
Tagstransport, seaport, shipyard, mykolaiv, shelling, re_damaged, industrial