Mykolaiv City Water Supply Infrastructure (Dnipro-Mykolaiv Canal System)
Система водопостачання Миколаєва (Дніпро-Миколаївський канал)
Location
| Oblast | Mykolaiv |
|---|---|
| Settlement | Mykolaiv |
| Address | Mykolaiv city water supply and canal infrastructure, Mykolaiv Oblast |
| Coordinates | 46.9750°N, 31.9946°E |
Damage Record
| Incident date | 2022-03-01 |
|---|---|
| Incident type | artillery shelling |
| Destruction level | Moderate (30–55%) |
| Re-damage count | 0 |
| Verified by | KSE, PRESS, UA_GOV |
Evidence sources
Wartime Status
| Lifecycle stage | Funded |
|---|---|
| Rebuildability | Rebuildable |
| Sovereign risk band | elevated |
| De-risking instruments | MIGA War & Civil Disturbance Insurance; UA Government Guarantee; EU Facility First-Loss Guarantee |
Physical Specifications
| capacity m3 per day | 200,000 m3/day modelled |
|---|
Reconstruction Cost Estimates
Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.
Baseline
Repair to pre-war condition
Code-compliant
Rebuild to current EU/UA building codes
Build-back-better
Rebuild with technology overlays
Financing Structures
Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.
Baseline
Show full capital stack
| Tranche | % |
|---|---|
| Grant (Pillar I) | 25% |
| ERA / Frozen Assets | 10% |
| First-loss / Guarantee | — |
| Concessional IFI Debt | 40% |
| Senior IFI (near-mkt) | — |
| ECA-Covered Debt | 8% |
| DFI Equity / Quasi-eq. | — |
| Public / Municipal Eq. | 17% |
| Diaspora / Patriotic Bd | — |
| Commercial Bank Debt | — |
| Institutional Debt | — |
| Private Equity / Infra | — |
Political risk insurance (optional): MIGA War & Civil Disturbance
WATER_BASELINE
Code-compliant
Show full capital stack
| Tranche | % |
|---|---|
| Grant (Pillar I) | 35% |
| ERA / Frozen Assets | 10% |
| First-loss / Guarantee | — |
| Concessional IFI Debt | 33% |
| Senior IFI (near-mkt) | — |
| ECA-Covered Debt | 8% |
| DFI Equity / Quasi-eq. | — |
| Public / Municipal Eq. | 14% |
| Diaspora / Patriotic Bd | — |
| Commercial Bank Debt | — |
| Institutional Debt | — |
| Private Equity / Infra | — |
Political risk insurance (optional): MIGA War & Civil Disturbance
WATER_CODE_COMPLIANT
Build-back-better
Mykolaiv water restoration was an early-reconstruction success story; lifecycle: funded reflects partial rebuild precedent; EBRD Green Cities Mykolaiv programme applicable; supply diversification overlay addresses single-source vulnerability that caused the 2022 crisis
Show full capital stack
| Tranche | % |
|---|---|
| Grant (Pillar I) | 45% |
| ERA / Frozen Assets | 8% |
| First-loss / Guarantee | — |
| Concessional IFI Debt | 22% |
| Senior IFI (near-mkt) | — |
| ECA-Covered Debt | 8% |
| DFI Equity / Quasi-eq. | — |
| Public / Municipal Eq. | 12% |
| Diaspora / Patriotic Bd | — |
| Commercial Bank Debt | — |
| Institutional Debt | 5% |
| Private Equity / Infra | — |
Political risk insurance (optional): MIGA War & Civil Disturbance, UK Export Finance
WATER_BBB
Record Metadata
| Asset ID | MYKOLAIV_WATER_SUPPLY_2022_03_01 |
|---|---|
| Last reviewed | 2026-10-22 |
| Schema version | 1.0.0 |
| Tags | water, water_supply, mykolaiv_oblast, shelling, early_reconstruction_precedent, canal |