Mykolaiv City Water Supply Infrastructure (Dnipro-Mykolaiv Canal System)

Система водопостачання Миколаєва (Дніпро-Миколаївський канал)

Water, Sanitation and Public Services water.supply Funded Rebuildable

Location

OblastMykolaiv
SettlementMykolaiv
AddressMykolaiv city water supply and canal infrastructure, Mykolaiv Oblast
Coordinates46.9750°N, 31.9946°E

View on OpenStreetMap ↗

Damage Record

Incident date2022-03-01
Incident typeartillery shelling
Destruction levelModerate (30–55%)
Re-damage count0
Verified byKSE, PRESS, UA_GOV

Evidence sources

Wartime Status

Lifecycle stageFunded
RebuildabilityRebuildable
Sovereign risk bandelevated
De-risking instrumentsMIGA War & Civil Disturbance Insurance; UA Government Guarantee; EU Facility First-Loss Guarantee

Physical Specifications

capacity m3 per day 200,000 m3/day modelled

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 65.8M – USD 375.2M
Central: USD 220M

Code-compliant

Rebuild to current EU/UA building codes

USD 75.5M – USD 469M
Central: USD 271.7M

Build-back-better

Rebuild with technology overlays

USD 85.2M – USD 600.6M
Central: USD 342.9M
Technology overlays: smart water meteringenergy efficient pumpingleak detectionreserve supply diversification

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

25%10%40%8%17%
Show full capital stack
Tranche%
Grant (Pillar I)25%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt8%
DFI Equity / Quasi-eq.—
Public / Municipal Eq.17%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

WATER_BASELINE

Code-compliant

35%10%33%8%14%
Show full capital stack
Tranche%
Grant (Pillar I)35%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt33%
Senior IFI (near-mkt)—
ECA-Covered Debt8%
DFI Equity / Quasi-eq.—
Public / Municipal Eq.14%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

WATER_CODE_COMPLIANT

Build-back-better

45%8%22%8%12%5%

Mykolaiv water restoration was an early-reconstruction success story; lifecycle: funded reflects partial rebuild precedent; EBRD Green Cities Mykolaiv programme applicable; supply diversification overlay addresses single-source vulnerability that caused the 2022 crisis

Show full capital stack
Tranche%
Grant (Pillar I)45%
ERA / Frozen Assets8%
First-loss / Guarantee—
Concessional IFI Debt22%
Senior IFI (near-mkt)—
ECA-Covered Debt8%
DFI Equity / Quasi-eq.—
Public / Municipal Eq.12%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt5%
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance, UK Export Finance

WATER_BBB

Record Metadata

Asset IDMYKOLAIV_WATER_SUPPLY_2022_03_01
Last reviewed2026-10-22
Schema version1.0.0
Tagswater, water_supply, mykolaiv_oblast, shelling, early_reconstruction_precedent, canal

← Back to atlas map

← Atlas map