Odesa and Mykolaiv Grain Export Terminals

Зернові експортні термінали Одеси та Миколаєва

⚠ Re-damaged 4 time(s) — material investor-information field
Industrial and Agricultural agricultural.grain_terminal Assessed Rebuildable

Location

OblastOdesa
SettlementOdesa
AddressOdesa and Mykolaiv port grain terminals, Black Sea coast
Coordinates46.4825°N, 30.7233°E

View on OpenStreetMap ↗

Damage Record

Incident date2022-04-01
Incident typemissile strike
Destruction levelModerate (30–55%)
Re-damage count4 ⚠ Material investor-information field
Verified by

Evidence sources

  • KSE Russia Will Pay — Odesa port infrastructure KSE

Wartime Status

Lifecycle stageAssessed
RebuildabilityRebuildable
Sovereign risk bandelevated
De-risking instrumentsMIGA War & Civil Disturbance Insurance; EBRD Risk Sharing Facility; UA Government Guarantee

Physical Specifications

throughput mt per year 25 million tonnes/year extracted from source
storage capacity mt — million tonnes pending data
storage capacity tonnes 3,500,000 tonnes modelled

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 170.8M – USD 912.3M
Central: USD 541.5M

Code-compliant

Rebuild to current EU/UA building codes

USD 196.2M – USD 1,140.6M
Central: USD 668.9M

Build-back-better

Rebuild with technology overlays

USD 221.7M – USD 1,460.4M
Central: USD 841.5M

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

5%5%15%20%10%10%35%
Show full capital stack
Tranche%
Grant (Pillar I)5%
ERA / Frozen Assets—
First-loss / Guarantee5%
Concessional IFI Debt15%
Senior IFI (near-mkt)20%
ECA-Covered Debt—
DFI Equity / Quasi-eq.10%
Public / Municipal Eq.—
Diaspora / Patriotic Bd—
Commercial Bank Debt10%
Institutional Debt—
Private Equity / Infra35%

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, ECA

INDUSTRIAL_BASELINE

Code-compliant

10%5%15%20%10%10%30%
Show full capital stack
Tranche%
Grant (Pillar I)10%
ERA / Frozen Assets—
First-loss / Guarantee5%
Concessional IFI Debt15%
Senior IFI (near-mkt)20%
ECA-Covered Debt—
DFI Equity / Quasi-eq.10%
Public / Municipal Eq.—
Diaspora / Patriotic Bd—
Commercial Bank Debt10%
Institutional Debt—
Private Equity / Infra30%

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, ECA

INDUSTRIAL_CODE_COMPLIANT

Build-back-better

15%5%15%20%10%10%25%

Green steel / decarbonisation pathway unlocks EU industrial recovery grants; private equity anchor expected from strategic investor

Show full capital stack
Tranche%
Grant (Pillar I)15%
ERA / Frozen Assets—
First-loss / Guarantee5%
Concessional IFI Debt15%
Senior IFI (near-mkt)20%
ECA-Covered Debt—
DFI Equity / Quasi-eq.10%
Public / Municipal Eq.—
Diaspora / Patriotic Bd—
Commercial Bank Debt10%
Institutional Debt—
Private Equity / Infra25%

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, ECA

INDUSTRIAL_BBB

Record Metadata

Asset IDODESA_MYKOLAIV_GRAIN_TERMINALS_2022_04_01
Last reviewed2026-10-22
Schema version1.0.0
Tagsindustrial, grain, odesa, port, missile_strike

← Back to atlas map

← Atlas map