Holy Transfiguration Cathedral, Odesa

Собор Преображення Господнього, Одеса

Heritage and Culture heritage.religious Assessed Rebuildable

Location

OblastOdesa
SettlementOdesa
AddressCathedral of the Transfiguration, Soborna Square, Odesa
Coordinates46.4878°N, 30.7346°E

View on OpenStreetMap ↗

Damage Record

Incident date2023-07-23
Incident typemissile strike
Destruction levelSevere (60–85%)
Re-damage count0
Verified byKSE, UA_GOV, UNESCO

Evidence sources

Wartime Status

Lifecycle stageAssessed
RebuildabilityRebuildable
Sovereign risk bandelevated
De-risking instrumentsMIGA War & Civil Disturbance Insurance; EU Facility First-Loss Guarantee

Physical Specifications

floor area m2 4,500 m2 estimated from photo
construction year 1,808 year extracted from source

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 20.5M – USD 174.7M
Central: USD 97M

Code-compliant

Rebuild to current EU/UA building codes

USD 22.6M – USD 217.8M
Central: USD 120.8M

Build-back-better

Rebuild with technology overlays

USD 25.9M – USD 279.3M
Central: USD 153.1M

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

30%10%40%20%
Show full capital stack
Tranche%
Grant (Pillar I)30%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.20%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

HERITAGE_BASELINE

Code-compliant

40%10%35%15%
Show full capital stack
Tranche%
Grant (Pillar I)40%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt35%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.15%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

HERITAGE_CODE_COMPLIANT

Build-back-better

55%10%25%10%

Heritage-designated sites command maximum grant share under EU cultural reconstruction programmes; heritage premium multiplier (1.8×–3.0×) applies over standard construction benchmark

Show full capital stack
Tranche%
Grant (Pillar I)55%
ERA / Frozen Assets10%
First-loss / Guarantee—
Concessional IFI Debt25%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.10%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance, UK Export Finance

HERITAGE_BBB

Record Metadata

Asset IDODESA_TRANSFIGURATION_CATHEDRAL_2023_07_23
Last reviewed2026-10-22
Schema version1.0.0
Tagsheritage, religious, odesa, missile_strike, unesco_world_heritage_city

← Back to atlas map

← Atlas map