Prydniprovska Combined Heat and Power Plant

Придніпровська ТЕЦ

Energy and Power energy.chp Assessed Rebuildable

Location

OblastDnipropetrovsk
RaionDnipro
SettlementDnipro
AddressPrydniprovska CHP, Dnipro, Dnipropetrovsk Oblast
Coordinates48.4351°N, 34.9656°E

View on OpenStreetMap ↗

Damage Record

Incident date2024-03-22
Incident typemissile strike
Destruction levelSevere (60–85%)
Re-damage count1
Verified byKSE, UA_GOV, UN_OCHA

Evidence sources

Wartime Status

Lifecycle stageAssessed
RebuildabilityRebuildable
Sovereign risk bandelevated
De-risking instrumentsMIGA War & Civil Disturbance Insurance; UA Government Guarantee; EBRD Risk Sharing Facility

Physical Specifications

installed capacity mw 820 MW extracted from source
heat output gcal h 1,340 Gcal/h extracted from source

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 436.5M – USD 940.2M
Central: USD 688.4M

Code-compliant

Rebuild to current EU/UA building codes

USD 502.3M – USD 1,179.5M
Central: USD 840.9M

Build-back-better

Rebuild with technology overlays

USD 568.1M – USD 1,497.1M
Central: USD 1,032.6M
Technology overlays: combined cycle upgradeheat pump integrationsmart grid integrationdistrict heat metering

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

30%40%30%
Show full capital stack
Tranche%
Grant (Pillar I)30%
ERA / Frozen Assets—
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.30%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (required): MIGA War & Civil Disturbance, EBRD RSF

ENERGY_BASELINE

Code-compliant

30%40%30%
Show full capital stack
Tranche%
Grant (Pillar I)30%
ERA / Frozen Assets—
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.30%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (required): MIGA War & Civil Disturbance, EBRD RSF

ENERGY_CODE_COMPLIANT

Build-back-better

30%40%30%

CHP rebuild with combined-cycle upgrade eligible for EU Energy Platform grants and EBRD climate-finance windows; district-heat modernisation qualifies for additional EU4Energy support

Show full capital stack
Tranche%
Grant (Pillar I)30%
ERA / Frozen Assets—
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.30%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (required): MIGA War & Civil Disturbance, EBRD RSF

ENERGY_BBB

Record Metadata

Asset IDPRYDNIPROVSKA_CHP_2024_03_22
Last reviewed2026-10-22
Schema version1.0.0
Tagsenergy, chp, dnipro, missile_strike, district_heating