Sloviansk Combined Heat and Power Plant

Слов'янська ТЕЦ

⚠ Re-damaged 3 time(s) — material investor-information field
Energy and Power energy.chp Documented Recently liberated

Location

OblastDonetsk
RaionKramatorsk
SettlementSloviansk
AddressSloviansk CHP, Sloviansk, Donetsk Oblast
Coordinates48.8614°N, 37.6153°E

View on OpenStreetMap ↗

Damage Record

Incident date2022-04-14
Incident typeartillery shelling
Destruction levelDestroyed (95–110%)
Re-damage count3 ⚠ Material investor-information field
Verified byKSE, UN_OCHA

Evidence sources

Wartime Status

Lifecycle stageDocumented
RebuildabilityRecently liberated
Sovereign risk bandsevere
De-risking instrumentsMIGA War & Civil Disturbance Insurance; EU Facility First-Loss Guarantee

Physical Specifications

installed capacity mw 270 MW extracted from source
heat output gcal h 410 Gcal/h estimated from photo

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 151.1M – USD 377.8M
Central: USD 264.4M

Code-compliant

Rebuild to current EU/UA building codes

USD 173.5M – USD 471.5M
Central: USD 323.2M

Build-back-better

Rebuild with technology overlays

USD 195.9M – USD 598.8M
Central: USD 397.4M
Technology overlays: combined cycle upgradesmart grid integrationdistrict heat meteringheat pump integration

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

30%40%30%
Show full capital stack
Tranche%
Grant (Pillar I)30%
ERA / Frozen Assets—
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.30%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (required): MIGA War & Civil Disturbance, EU Facility First-Loss

ENERGY_BASELINE

Code-compliant

30%40%30%
Show full capital stack
Tranche%
Grant (Pillar I)30%
ERA / Frozen Assets—
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.30%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (required): MIGA War & Civil Disturbance, EU Facility First-Loss

ENERGY_CODE_COMPLIANT

Build-back-better

30%40%30%

Reconstruction in recently liberated Donetsk Oblast; reconstruction finance contingent on sustained security; EU recovery grants and EBRD concessional lending applicable post-stabilisation

Show full capital stack
Tranche%
Grant (Pillar I)30%
ERA / Frozen Assets—
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.30%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (required): MIGA War & Civil Disturbance, EU Facility First-Loss

ENERGY_BBB

Record Metadata

Asset IDSLOVIANSK_CHP_2022_04_14
Last reviewed2026-10-22
Schema version1.0.0
Tagsenergy, chp, donetsk, sloviansk, artillery_strike, destroyed

← Back to atlas map

← Atlas map