Ukrenergo Pivnichna 750kV Substation

Підстанція «Північна» 750 кВ НЕК Укренерго

⚠ Re-damaged 2 time(s) — material investor-information field
Energy and Power energy.substation Assessed Rebuildable

Location

OblastKyiv
RaionVyshhorod
SettlementVyshhorod
AddressPivnichna 750kV Substation, Vyshhorod Raion, Kyiv Oblast
Coordinates50.7200°N, 30.4500°E

View on OpenStreetMap ↗

Damage Record

Incident date2024-03-22
Incident typemissile strike
Destruction levelSevere (60–85%)
Re-damage count2 ⚠ Material investor-information field
Verified byIEA, KSE, UA_GOV

Evidence sources

Wartime Status

Lifecycle stageAssessed
RebuildabilityRebuildable
Sovereign risk bandelevated
De-risking instrumentsMIGA War & Civil Disturbance Insurance; EU Facility First-Loss Guarantee; EBRD Risk Sharing Facility

Physical Specifications

capacity mva 1,500 MVA extracted from source

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 54.6M – USD 215.5M
Central: USD 135.7M

Code-compliant

Rebuild to current EU/UA building codes

USD 63M – USD 268.6M
Central: USD 166.5M

Build-back-better

Rebuild with technology overlays

USD 71.4M – USD 344.2M
Central: USD 208.5M

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

10%5%5%25%25%5%15%10%
Show full capital stack
Tranche%
Grant (Pillar I)10%
ERA / Frozen Assets5%
First-loss / Guarantee5%
Concessional IFI Debt25%
Senior IFI (near-mkt)25%
ECA-Covered Debt—
DFI Equity / Quasi-eq.5%
Public / Municipal Eq.15%
Diaspora / Patriotic Bd—
Commercial Bank Debt10%
Institutional Debt—
Private Equity / Infra—

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, BPIFrance Assurance Export

ENERGY_BASELINE

Code-compliant

20%5%5%25%20%5%15%5%
Show full capital stack
Tranche%
Grant (Pillar I)20%
ERA / Frozen Assets5%
First-loss / Guarantee5%
Concessional IFI Debt25%
Senior IFI (near-mkt)20%
ECA-Covered Debt—
DFI Equity / Quasi-eq.5%
Public / Municipal Eq.15%
Diaspora / Patriotic Bd—
Commercial Bank Debt5%
Institutional Debt—
Private Equity / Infra—

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, BPIFrance Assurance Export

ENERGY_CODE_COMPLIANT

Build-back-better

30%5%5%25%15%5%10%5%

EU Facility energy-security track; EBRD Energy Efficiency and Resilience Facility; private co-investment (operator equity) credible for BBB path with carbon-transition roadmap

Show full capital stack
Tranche%
Grant (Pillar I)30%
ERA / Frozen Assets5%
First-loss / Guarantee5%
Concessional IFI Debt25%
Senior IFI (near-mkt)15%
ECA-Covered Debt—
DFI Equity / Quasi-eq.5%
Public / Municipal Eq.10%
Diaspora / Patriotic Bd—
Commercial Bank Debt5%
Institutional Debt—
Private Equity / Infra—

Political risk insurance (required): MIGA War & Civil Disturbance, UK Export Finance, BPIFrance Assurance Export

ENERGY_BBB

Record Metadata

Asset IDUKRENERGO_PIVNICHNA_SUBSTATION_2024_03_22
Last reviewed2026-10-22
Schema version1.0.0
Tagsenergy, substation, ukrenergo, kyiv_oblast, missile_strike, grid_critical, re_damaged

← Back to atlas map

← Atlas map