Vinnytsia Combined Heat and Power Plant

Вінницька ТЕЦ

Energy and Power energy.chp Assessed Rebuildable

Location

OblastVinnytsia
SettlementVinnytsia
AddressVinnytsia CHP, Vinnytsia, Vinnytsia Oblast
Coordinates49.2328°N, 28.4753°E

View on OpenStreetMap ↗

Damage Record

Incident date2022-07-14
Incident typemissile strike
Destruction levelModerate (30–55%)
Re-damage count0
Verified byKSE, UA_GOV, UN_OCHA

Evidence sources

Wartime Status

Lifecycle stageAssessed
RebuildabilityRebuildable
Sovereign risk bandelevated
De-risking instrumentsMIGA War & Civil Disturbance Insurance; UA Government Guarantee

Physical Specifications

installed capacity mw 120 MW extracted from source
heat output gcal h 290 Gcal/h extracted from source

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 53.2M – USD 120.3M
Central: USD 86.7M

Code-compliant

Rebuild to current EU/UA building codes

USD 61.6M – USD 149.7M
Central: USD 106.3M

Build-back-better

Rebuild with technology overlays

USD 70M – USD 190.3M
Central: USD 130.1M
Technology overlays: combined cycle upgradeheat pump integrationdistrict heat meteringsmart grid integration

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

30%40%30%
Show full capital stack
Tranche%
Grant (Pillar I)30%
ERA / Frozen Assets—
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.30%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

ENERGY_BASELINE

Code-compliant

30%40%30%
Show full capital stack
Tranche%
Grant (Pillar I)30%
ERA / Frozen Assets—
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.30%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

ENERGY_CODE_COMPLIANT

Build-back-better

30%40%30%

Moderate damage enables faster repair timeline; EU4Energy grants applicable for heat modernisation; Vinnytsia location well behind frontline reduces security premium

Show full capital stack
Tranche%
Grant (Pillar I)30%
ERA / Frozen Assets—
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.30%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance

ENERGY_BBB

Record Metadata

Asset IDVINNYTSIA_CHPP_2022_07_14
Last reviewed2026-10-22
Schema version1.0.0
Tagsenergy, chp, vinnytsia, missile_strike, district_heating

← Back to atlas map

← Atlas map