Zaporizhzhia Road Bridge over the Dnipro (Preobrazhenka)

Запорізький автомобільний міст через Дніпро (Преображенка)

Transport and Ports transport.bridge Assessed Rebuildable

Location

OblastZaporizhzhia
SettlementZaporizhzhia
AddressDnipro road crossing, Zaporizhzhia, Zaporizhzhia Oblast
Coordinates47.8020°N, 35.0890°E

View on OpenStreetMap ↗

Damage Record

Incident date2022-10-20
Incident typemissile strike
Destruction levelModerate (30–55%)
Re-damage count1
Verified byKSE, UN_OCHA

Evidence sources

Wartime Status

Lifecycle stageAssessed
RebuildabilityRebuildable
Sovereign risk bandelevated
De-risking instrumentsMIGA War & Civil Disturbance Insurance; UA Government Guarantee; EBRD Risk Sharing Facility

Physical Specifications

bridge length m 1,390 m extracted from source
carriageway width m 14 m extracted from source

Reconstruction Cost Estimates

Cost figures are estimates derived from published unit-cost benchmarks (RDNA4, KSE Institute) and named comparable Ukrainian precedents. Not guarantees, not procurement quotes. All amounts in USD millions.

Baseline

Repair to pre-war condition

USD 37.4M – USD 86.7M
Central: USD 62.1M

Code-compliant

Rebuild to current EU/UA building codes

USD 42.8M – USD 108.1M
Central: USD 76M

Build-back-better

Rebuild with technology overlays

USD 49.2M – USD 137M
Central: USD 93.1M
Technology overlays: seismic resiliencesmart monitoringactive travel lanes

Financing Structures

Twelve-tranche capital stack derived from sector × path templates (RDNA4, EU Facility, EBRD). All tranches sum to 100%.

Baseline

30%5%40%25%
Show full capital stack
Tranche%
Grant (Pillar I)30%
ERA / Frozen Assets5%
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.25%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance, EBRD RSF

TRANSPORT_BASELINE

Code-compliant

30%5%40%25%
Show full capital stack
Tranche%
Grant (Pillar I)30%
ERA / Frozen Assets5%
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.25%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance, EBRD RSF

TRANSPORT_CODE_COMPLIANT

Build-back-better

35%5%40%20%

Critical Dnipro crossing for southern Ukrainian supply routes; moderate damage allows repair rather than full replacement; EU TEN-T extension programme applicable for connectivity investment

Show full capital stack
Tranche%
Grant (Pillar I)35%
ERA / Frozen Assets5%
First-loss / Guarantee—
Concessional IFI Debt40%
Senior IFI (near-mkt)—
ECA-Covered Debt—
DFI Equity / Quasi-eq.—
Public / Municipal Eq.20%
Diaspora / Patriotic Bd—
Commercial Bank Debt—
Institutional Debt—
Private Equity / Infra—

Political risk insurance (optional): MIGA War & Civil Disturbance, EBRD RSF

TRANSPORT_BBB

Record Metadata

Asset IDZAPORIZHZHIA_ANTONIVKA_BRIDGE_2022_10_20
Last reviewed2026-10-22
Schema version1.0.0
Tagstransport, road_bridge, zaporizhzhia, missile_strike, moderate

← Back to atlas map

← Atlas map